Filter Project HighSite Status Member

KM Square - General  - Planned Project Lead: CTWUG
Generic unplanned project for donations to KM Square.

Required Items
Item  Qty Unit Price   Price
Total Excl  
Total Incl  


Donations
Member  Date Amount  
 ddebeyer  24 March 2014 50.00  
 Ruffy  26 March 2014 100.00  
 ddebeyer  23 April 2014 50.00  
 Unknown  31 May 2014 500.00  
 ddebeyer  23 June 2014 50.00  
 Yazeed Fataar  22 July 2014 100.00  
 ddebeyer  23 August 2014 50.00  
 Dcrafford  28 October 2014 400.00  
 ddebeyer  29 November 2014 150.00  
 CTWUG  23 May 2015 -1450.00  
Total 0.00
Balance 0.00

Mammon-Cslling-Psycho new backbone  - Planned Project Lead: Diabolix
A new backbone to be installed from Mammon to Psycho via Cslling. As Psycho already has a BB via Zassie to Rhea, this will provide additional throughput to Bellville North and Brackenfell areas. This project will be 100% funded by the Bellville community.

Required Items
Item  Qty Unit Price   Price
Ubiquiti 5GHz AirMaxAC PowerBeam 25dBi 400mm Dish  2  1425.00 2850.00
MikroTik RBSXT5nDr2 Outdoor 5GHz WiFi CPE  1  850.00 850.00
Linkbasic 100M Shielded UV Protected Cat5e Cable  1  625.00 625.00
Shielded RJ45 Connector with Grounding Terminal (50-pack)  1  115.00 115.00
Total Excl  4440.00
Total Incl  5061.60


Donations
Member  Date Amount  
 Cadaver  22 July 2016 500.00  
 Anonymous donor  22 July 2016 500.00  
 Griffin-sa  16 August 2016 200.00  
 Griffin-sa  15 September 2016 100.00  
 Sheriff  29 November 2016 500.00  
 Griffin-sa  29 November 2016 100.00  
Total 1900.00
Balance -3161.60

MLB Repair  - Planned Project Lead: Pollyg
These funds will be used to repair the MLB site. The exact spec is yet to be determined but will be added once the damage has been quantified and a project plan has been put in place.

Required Items
Item  Qty Unit Price   Price
Total Excl  
Total Incl  


Donations
Member  Date Amount  
 Ogon  31 May 2014 100.00  
 CTWUG Mplain  01 June 2014 500.00  
 Deejay  03 June 2014 100.00  
 Demonpc  26 October 2016 150.00  
Total 850.00
Balance 850.00

Oakdale-Hellsangel backbone  - Planned Project Lead: Diabolix
Backbones to link Baksteun to Nitros and Nitros to Hellsangel. This project will be 100% funded by the Bellville community.

Required Items
Item  Qty Unit Price   Price
MikroTik DynaDish 5GHz  1  2450.00 2450.00
Ubiquiti 5GHz AirMaxAC PowerBeam 25dBi 400mm Dish  2  1425.00 2850.00
Linkbasic 100M Shielded UV Protected Cat5e Cable  1  625.00 625.00
Total Excl  5925.00
Total Incl  6754.50


Donations
Member  Date Amount  
 Proximal  30 July 2016 250.00  
 nitros  04 August 2016 500.00  
 Jmongie  17 August 2016 700.00  
 Konrad  27 August 2016 150.00  
 Highvoltage  30 August 2016 100.00  
 Sabishii  30 August 2016 100.00  
 Highvoltage  30 August 2016 100.00  
 Anonymous donor  31 August 2016 108.00  
 Baksteun  21 September 2016 400.00  
 CTWUG  07 October 2016 -512.45  
 Diabolix  29 November 2016 200.00  
 Highvoltage  07 December 2016 356.25  
 Anonymous donor  07 December 2016 100.01  
 Baksteun  24 December 2016 500.00  
 Positive  17 February 2017 250.00  
 Positive  21 February 2017 150.00  
 Highvoltage  21 February 2017 140.00  
Total 3591.81
Balance -3162.69

Prometheus sector upgrade  - Planned Project Lead: King
Upgrade of the SW sector on Prometheus to Dual Polarity. CTWUG will fund 50% of this project.

Required Items
Item  Qty Unit Price   Price
RB-BASEBOX5  1  1050.00 1050.00
5GHz AirMax Sector 120' 19dBi  1  1625.00 1625.00
Ubiquiti Sector RF Shield  1  120.00 120.00
Routerboard 912 Adaptor  1  20.00 20.00
Total Excl  2815.00
Total Incl  3209.10


Donations
Member  Date Amount  
 CTWUG  23 June 2015 1604.55  
Total 1604.55
Balance -1604.55

Prometheus-King02  - Planned Project Lead: King
I would like to upgrade this link to run AC and use it as a case study to asses feasibility and performance gains for the rest of the network Currently the link plagued by random issues where the CCQs drop from 100% to less than 10% for no apparent reason. A reboot then resolves the issue for a few days and then it happens again. We believe that a hardware upgrade will resolve this permanently.

CTWUG has agreed to 75% funding for this project.

Required Items
Item  Qty Unit Price   Price
ROS L4 720Mhz 128MB 1xGE 1x5GHz  2  1195.00 2390.00
Flex-Guide 0 5M RPSMA-RPSMA Cable  4  120.00 480.00
Routerboard 912 Adaptor  2  18.00 36.00
Total Excl  2906.00
Total Incl  3312.84


Donations
Member  Date Amount  
 CTWUG Rebate  30 September 2014 2484.63  
 AJ  19 November 2014 100.00  
 Anonymous donor  18 September 2015 100.00  
Total 2684.63
Balance -628.21

stiaanm-Nightsight link upgrade  - Planned Project Lead: Stiaanm
The link between stiaanm and Nightsight is to be upgraded to ac. This project is 100% community-funded

Required Items
Item  Qty Unit Price   Price
MikroTik DynaDish 5GHz  2  2175.00 4350.00
Total Excl  4350.00
Total Incl  4959.00


Donations
Member  Date Amount  
 Orthochick  17 November 2016 500.00  
 Stiaanm  18 November 2016 500.00  
Total 1000.00
Balance -3959.00

Venus General  - Planned Project Lead: CTWUG
Generic unplanned project for donations to Venus highsite.

Required Items
Item  Qty Unit Price   Price
Total Excl  
Total Incl  


Donations
Member  Date Amount  
 Mookey  08 March 2014 100.00  
 Mookey  06 May 2014 100.00  
 Mookey  30 March 2015 100.00  
 Mookey  30 June 2015 100.00  
 Mookey  31 July 2015 200.00  
 Mookey  27 August 2015 100.00  
 Mookey  28 September 2015 100.00  
 Mookey  30 October 2015 100.00  
 Mookey  26 November 2015 100.00  
 Mookey  27 January 2016 100.00  
 Mookey  29 March 2016 100.00  
 Mookey  29 June 2016 100.00  
 Mookey  28 November 2016 100.00  
 Mookey  30 January 2017 200.00  
Total 1600.00